Project Details

Location City of Wildwood, NJ

Client City of Wildwood Water Utility

Service(s) Provided All Permitting; Design Work and Surveying; Bid and Contract Documents; Bid Coordination and Evaluation; Resident Engineering; Construction Inspection; Project Closeout

Kirkwood_4

Wildwood Kirkwood Well Project

This project involved the construction of 3 new Kirkwood Aquifer Wells to supplement and offset the use of the Water Utility’s existing Cohansey Aquifer wells. Additionally, the work involved all associated piping and equipment for the wells including electrical controls, emergency power, valving and interconnect piping as well as approximately 3,300 linear feet of transmission main piping to connect to the existing system.