Bms_hopewell
Project Details

Location Hopewell, NJ

Client Bristol-Myers Squibb

Project Size 440 Acres; 350,000 Sq. Ft.

Service(s) Provided Boundary,Topographic and Underground Utilities Survey; Site/Civil Engineering Design; Utilities Systems Evaluation and Engineering Design for chilled water, gray water, potable water, fire water, sewer and other required utilities; Environmental Investigations and Permitting; Contractor Bidding and Review; Construction Administration

Bms_hopewell

Bristol-Myers Squibb Corporation

Van Note-Harvey Associates provided overall survey, wetlands consulting, and site and utilities engineering for the redevelopment of the 440 acre campus. These facilities include: the 20,300 sq. ft. Building 11; the 12,250 sq. ft. Building 8; the 26,100 sq. ft. Building 17A; the 135,000 sq. ft. Building 21; and a 450 car parking facility, representing a construction cost of approximately $25,000,000.